In the Epic view select the “Export information” option from the menu, after clicking the menu icon.
Select the “Integrated Application (Export)“ in the export type field and then select the relevant integrated application from the dropdown option field.
Once selected and the Jira projects have been loaded, select a Jira project and Issue type. If there is a saved mapping, this should be automatically loaded in.
Selected “TEST MAPPING”. If successful you will be able to select “EXPORT DATA”.
After a successful export, the fullscreen popup should close and you should see a successful message in the bottom left of the screen.
Expanding the Epic you should see an integrations section, listing the exported Issue. Exporting the data has created an integration link between the Jira Issue and StorYd Epic.